2026-03-04 Jake prep - product strategy minutes
Context¶
{: .section-gray }
Pre-meeting strategy note for the Army project discussion with Jake.
Strategic framing¶
{: .section-blue }
-
Immediate product scope: automate ATC safety board-pack generation from existing reporting artifacts.
-
Long-term ambition around ASIMS-scale capability remains future-state and is out of Phase 1 scope.
Problem statement¶
{: .section-orange }
-
Current reporting workflow is manual and fragmented across PDFs, email, and chat.
-
Board packs are inconsistent between periods and analysts.
-
Trend linkage is weak because similar events are not systematically connected.
Phase 1 solution¶
{: .section-yellow }
-
Read-only ingestion of safety report PDFs and related exports.
-
Automated clustering of similar events with evidence links.
-
Standard board-pack output: 7/30/90 trend windows, top recurring themes, rising issues.
-
Searchable drill-down mapping every report into clusters.
-
Audit trail of inputs and processing.
Non-goals and guardrails¶
{: .section-red }
-
No policy-breach determination or compliance adjudication.
-
No replacement of ASIMS or human judgement.
-
No forced reporting-process change in pilot stage.
Pilot design¶
{: .section-purple }
-
Input: 12–24 months historical reports, redacted if required.
-
Duration: 4–6 weeks.
-
Metrics: time-to-pack reduction, repeat-linking quality, user usefulness score.
Decisions needed with Jake¶
{: .section-red }
[!unsupported] Unsupported Notion block preserved as placeholder: to_do
[!unsupported] Unsupported Notion block preserved as placeholder: to_do
[!unsupported] Unsupported Notion block preserved as placeholder: to_do
[!unsupported] Unsupported Notion block preserved as placeholder: to_do